Tuesday, March 10, 2020

Holika Dahan & Holi

The festival of Colours/Holi begins to our society one day before Holi wnamely"Holika Dahan". Members participated in this rituals in large numbers but the presence of CORONOVIROUS were visible here also when large numbers of people prefer to be at home lock.









On the day 2,similar to the day 1 as Holika Dahan,fewer members join the group of festivity as a precaution of CORONOVIRUS which may not affective much in India as the beginning of Summer is knocking at door where temperature will immediately shoot up to 38 to 40 °C whereas virus can not sustain the the temperature beyond 27°C.
Hereunder are few glimpses of Holi


From 1pm onward we served lunch for those families who deposited the amount as a participants.
Next time onwards we are planning to arrange HOLIMILAN in evening where we may arrange goods for participants.

Regards,
-pramodara



Tuesday, March 3, 2020

FEBRUARY 2020,A FLIGHT DISRUPTIONS


February Disruptions

February has seen an incident of One Bird Hit that results in flight disruptions at CMB where RADOME was replaced.

No Hard Landing was reported but There were 05 reporting of Fuel Filter clog Warning.In one such case Fuel ∆S/W was replaced.

VT-EXA 02/02 at TRV F/O MCDU F plan,UT ,FOB not displayed and unable to engage AP2 after TO,P2 sixe no range display avl.The snag was rectified by replacing FCU.

PPQ AMD ON 03/02 ENG1 OIL FILTER CLOG WRG.OIL FILTER WAS REPLACED.

VT-SCH NAG/12/02/20 GNd crew reported ENG 2 TAIL PIPE FIRE after Engine S/D.TSM Task 72-00-00-810-801-A c/o.No abnormalities OBSD.on further reporting of the snag on 13/02 Oil Inlet Cover Seal and Gasket replaced as per above AMM task and finally subject Engine was replaced.

PPM BLR 6/03 for "Parking Brake inoperative",Parking Brake electrical control Valve and BSCU were replaced.
Snag was not reported thereafter.

CIG BLR/19/02 During Taxy obsd Eng 2 N1,EGT,N2 AND FF parameters fluctuating abnormally around N1 24%.Acft returned back to bay for which EIU was replaced.

PPI was withdrawn on 21/02 due Brake accumulator presdure not holding.Parking Brake accumulator relief valve was replaced.

EDD was AOG at CMB on dated 27/02 due BIRD HIT whereby  RADOME got damage.RADOME was replaced.

EXP had an incident at DEL on dated 28/02 due Y HYD Loss in flight,HYD Y RSVR LO LVL.During investigation obsd Y HYD pipe line in pylon ruptured,Same replaced.

-pramodara