Potable water disinfection

Potable Water Disinfection and discard the filter elements 

AMM task 38-10-00-670-002-A

Procedure by the use of Hydrogen peroxide H2O2

38-10-00-670-004-A

Sequence to be followed as under:-

Hot water flushing then Disinfection and again Hot water flushing to be done.

Replacement of the Galley water Filter elements.

Refer AMM 38-12-23-920-802-A

Before replacing the filter,Close the potable water shut off Valve,in the galley release the remaining water.

FIN 6475MM & 6483MM

Filter P/N- Check it's applicability.

Replace the applicable Filter along with its Gasket then carry out the leak check.

For zone/ location of the Filter,refer applicable AMM.

Leak is not permitted.


ENGINE WATER WASH

Engine Water Wash


Water wash procedure (Menu mode) Non detergent 

Follow these steps and refer AMM:-

AMM TASK 72-00-00-740-801-A

Open the CBs at 49VU A01/A02for Eng 1 /Eng 2

Prepare the Engine for Washing as follows:-

(1) Disconnect PS3 and P3B line and put the covers on PS3,P3B and open ports of Pr sub system box

(2) Install the Wash Tool

(3)On 25 VU,ensure that ON legend of Anti ICE  /ENG 1(2) PB IS OFF

(4)Make Sure that OFF legend on Engine 1(2) bleed sw is on

(5)Pack1/Pack2 PB switches are OFF

Two persons are required to do this job,

(6)Record the initial TDS of wash supply Water,

(7) Select the water wash procedure Menu mode iaw AMM 72-00-00-740-801

(8) After 10 sec of motoring with a positive can rotation,inject the water on the LPC through the fan blades and stop the water injection before the end of the engine motoring,

(9) During the engine coast down,collect the sample of water wash that drains from the exhaust area of the engine,

(10)Measure and make the record of TDS

Subtract the initial TDS  value from the TDS of rinse sample and if the net TDS is less than 150ppm additional rinse cycle is not required otherwise go for additional rinse until the net TDS is less than or equal to 150ppm.

Maintain a soaking period of 10 to 15minutes between the cycles.

A maximum of 4 cycles are permitted.


(11) Installation of the Disconnected lines

Blow the PS3 and P3B line by the compressed air.Pr should be between 100 to 200 psi only.

Connect the PS3&P3B line to the pr sub system box and remove the wash tool.

(12) Post Engine water Wash:-

Ensure that PACK1 & PACK2 are OFF,

X bleed valve OPEN

ENG 1 (2) Bleed PB sw is released,

CAB FANS PB SW is set OFF

Start the Engine,

After the engine start,put the APU Bleed PB sw to the OFF position,

Let the engine run idle for 5 minutes,

Press the ANTI ICE/ENG PB to operate the ENG anti ice system,after 30 sec put the anti ice pb to OFF.

Press the ENG 1(2) Bleed PB sw to ON

Press the ANTI ICE /wing ON to operate WAI,

WAI  valves will automatically close after 30 sec however legends remain illuminated until the sw is deselected.

Once WAI is closed, let the engine run for 5 minutes.

WAI is pressed ON once again and the process is repeated.

Run the engine for 5 minutes.

Turn the cross Bleed Valve to auto,press PACK1/PACK2 ON,run the engine for 5 minutes.if you smell the odor in the cabin, operate the engine until the odor remains.

Shut down the engine.

Release the Aircraft.



Thursday, August 27, 2026

Vacuum Generator

Removal/Installation of vacuum Generator 

FIN 37MG

P/N-14330-375

Thread locking adhesive-05BAA1 OR LOCTITE 259

ZONE-160&170

FOLLOWING CBs are saftied open,

2001 VU-A02,A03&A05 

Follow AMM Task-38-31-64-000/400-001-A

Wednesday, August 26, 2026

Fuel Filter replacement of A321 Aircraft

Fuel Filter Replacement of A321
Fuel Filter housing FIN No-3801EM1/EM2.FILTER installed in fuel filter housing.

Required job set ups are as follows:-
Fuel Filter P/N-1326-8043 Qty 01
Packing P/N-1381-1176 Qty 02
Packing Performed-
P/N 1391-0275 Qty 01
Lock wire CP8001
TQ Wrench 0-50 lbf-ft
Follow removal & installation AMM TASK-73-11-10-000/400-802-A.

After an accomplishment of the job c/o Dry motoring test IAW 71-00-00-700-805.

Tuesday, August 25, 2026

Functional check of OPV of A320 Aircraft

Functional check of Over Pressure Valve of A320 Aircraft

OPV functional check:-

OPEN PANEL 413CT on Engine Pylon,

REMOVE THE BLANK of OPV BY CUTTING TH OkkE LOCK WIRE,

ATTACH THE N2 HOSE OF THE TEST KIT TO THE BLANK I iiN RHS OPV UNIT(AFT LOOKING FWD) ,
CHECK THAT INDICATOR IS AT "OPEN" m,y

Hu see her. Byi³³j³3
DD rk

ug7the u

THROUGH THE N2 BOTTLE Ikv.NCREASE THE PR TO 95 PSI AND ENES RE THAT VALVE GOES SMMOTHLY TO "CLOSE" psn,

R thisEDUCE TH guy yn8gE PR TO 70 PSI AND CHECK THAT VALV. Uma t mi gy6E MOVES SMOOTHLY IN "OPEN" PSN.

After the check is performed, close the Engine cowl.

This is just a g4uide line to perform the job for ll details refer AMM TAS4K 4

Monday, August 24, 2026

Floating Deck Resort,Bhuj


FDR popularly known as Floating Deck Resort,is just 5km away from Bhuj Airport,is a popular leisure destination in the Bhuj–Kutch region, offering a peaceful farm-resort environment away from the city's busy surroundings.


This is also closer(2.5km) to Seven sky Clarks Exotica and rooms are available on competitive price with multi cuisine restaurant.Maintenance of rooms and it's services outclass Seven sky Clarks.


Rooms are available on twin sharing at a very comfortable price @Rs 3000 toRs.3500/-


The property is known for its spacious premises, natural surroundings, comfortable accommodation and facilities suitable for romance & family outings, group gatherings and social functions.

Its open spaces and resort-style ambience make it a convenient place for relaxation and short stays while exploring Bhuj and the Kutch region.


Saturday, August 15, 2026

Glimpses of Independence Day Celebration at ROYAL GREEN APARTMENTS 🇮🇳




Our society,namely ROYAL GREEN APARTMENTS,celebrated Independence Day with great enthusiasm, patriotic spirit and a strong sense of togetherness. The celebration began with the unfurling of the National Flag, followed by the National Anthem and patriotic slogans.


The highlight of the celebration was the cultural programme presented by our talented children. The young participants beautifully showcased their love for the nation through patriotic songs, dances, poems and other performances. Their confidence, energy and enthusiasm truly added colour to the occasion.

From soulful patriotic renditions to vibrant dance performances and inspiring recitations, each presentation reflected the spirit of patriotism and the rich cultural values of our society. The performances were warmly applauded and appreciated by all residents.

The celebration was not merely an event but a wonderful opportunity for children, senior citizens and residents to come together as one community. The cheerful participation of everyone made the occasion memorable and strengthened the bond of unity and harmony among us.

The independence day program was end up with brunch.

Food in Que 

A few glimpses of the cultural activities are a beautiful reminder that the spirit of our nation lives on in the hearts of our young generation. 🇮🇳


Jai Hind!

Jai Hind!