THS Actuator jamming operational check
THS Actuator jamming operational check
Access platform-20Feet
Open the panel-312AR
Jamming Tool-0U190857
Feeler gauge -1.2mm
Lock wire-14QEB1(.6mm)
Minimum Two persons -One in cockpit and one in THS Compartments
AMM Reference-
27-44-00-710–001-A
Lockwired caps marked in the RED BOX above in the picture are to be cut and removed to install a Jamming Tool(shown in pic below)on the shaft spline of the control shaft.
THS Jamming Test:-
Four Tests are to be done
(1)Elec.Mode RH VALVE BLOCK- TOOL MARKS A/C N UP,
(2)Elec.Test LH VALVE BLOCK- TOOL MARKS A/C N UP,
(3)Mech Mode LH VALVE BLOCK-LH A/C N DN,
(4)Mech Mode,RH VALVE BLOCK-RH A/C N DN
Gap to be checked between input plate and Ball carrier.This is behind the valve control Shaft.Gap must not be exceeding 1.2mm.
Reference mark is on the control valve detent.
Step 1:-
Alignment of the Left and Right control Valve detents:-
Put one end of the Jamming tool on the splined end of the Valve control shaft,
Use the tool side N UP or N DN mark of the Jamming tool that puts the spigot nearest to the recess,
Turn the mechanical input of the THS ACTUATOR until the jamming tool goes into the recess.
If the Jamming tool is installed with the side LH or RH with A/C N DN marks,turn the mechanical input clockwise until the detent is centred with a click sound.
If the Jamming tool is installed with the LH or RH with A/C N.UP Marks,turn the mechanical input CCW until the detent is centred with a click sound.
If it is not centred then turn the mechanical input until you get Click
sound.
Step 2:-Depressurised the hydraulic and ELAC 1,SEC1 ON 23VU & ELAC2 &SEC 2 are released so that OFF light comes ON.
Now,follow AMM TASK for the test procedures.
Once all the four tests are performed,normalised the Aircraft.
Tuesday, September 8, 2026
RE-FUELING WITH MANUAL PLUNGER OVERRIDE
An access platform of 13 feet is required to position below the re-fueling panel 522JB(7QU) Or 622JB(8QU)
For CTR TANK we need to open RH LDG GEAR.
Open the panel by opening its 8 screws.
Access Panel P/N-D5744379300500A
Bolt- NAS1790C4R4P, QTY 08
Refuel Valve P/N 1158000-45
AMM REF 28-25-00-040-005-A
Minimum Two persons are required to do the refueling.
One person is to be positioned at 192MB
panel to monitor fuelAnother at 622JB panel to push the plunger to open the refuel valve.
and 3rd one inside the cockpit as per company requirements.
Re-fueling starts to the affected tanks as long as one presses/overrides the plunger as shown above in the picture.
Refer AMM for details.
Monday, September 7, 2026
Discard Cargo Fire Extinguisher Water absorbing Filter
Saturday, September 5, 2026
FAN AIR VALVE
FAN AIR VALVE
Panel No 415AR
FIN NO-7120HM1/7120HM2
SCREWS P/N-ASNA2001T3-9
PANEL P/N-D5452023920000
ROD P/N-L0003007704100
BOLT P/N-ASNA0093P4-13
FAV P/N-70649A010002
FAV Actuator P/N-70654A020001
Removal/installation of FAN AIR VALVE
36-11-54-960-804-A or
36-11-54-000/400-805-A
R/I of FAV Actuator AMM Ref 36-11-54-000/400-804-A
Manual test of FAV:-
Open the Rod end connecting actuator bolt and move rod in and out.Check for free movement of the FAN AIR VALVE.
AMM Ref:-36-11-54-750-052-A
FAN AIR VALVE ACTUATOR(9HA1/9HA2)
Step 1-Disconnect the Electrical contractor
Step 2-Disconnect the sense line
Step 3-Remove the screw that attach Rod end and Actuator
Step-3 Bold the actuator and loosen the Nut 7,refer pic above.
Step 4 Disengage the pin of the actuator from the support bracket and remove the actuator
Follow respective AMM for accomplishment of the job.
Friday, September 4, 2026
Janamashtmi at Shivalaya,Royal Green Apartments
Divine Celebrations at Shivalaya
A beautiful and spiritually uplifting celebration was held at Shivalaya, Royal Green Apartments, bringing residents together in an atmosphere of devotion, peace and togetherness.
The prayers, rituals and collective participation of residents made the occasion truly special. The divine ambience filled our community with positivity, harmony and blessings.
Heartfelt thanks to everyone who participated and contributed to making the celebration memorable.
Glimpses of celebrations are given below.
Har Har Mahadev! 🔱🙏
Tuesday, September 1, 2026
ECS DUCT & SEGMENT 2 ENG KIT REMOVAL
Removal/installation of ECS DUCT P/N M251270
C-Duct Metallic Seal P/N-AS1895/23-400 QTY -02
AMM 36-11-49-000/400-831-A
Removal/installation of segment 2 Engineering kit
Loosen both the VBV duct prior to sliding this segment in its place.
Further upper plate of segment 3 also to be loosened.
TQ Wrench -0 to 150 lbf-inch
AMM 72-24-01-000/400-801-A
Sub task 72-24-01-420-056-A