Monday, November 16, 2026

Chhath puja 2026


         CHHATH PUJA 2026

Chhath Puja was celebrated with immense devotion, enthusiasm and traditional fervour within the premises of Royal Green Apartments, Sector 11, Dwarka. The celebration brought residents together, creating an atmosphere of spirituality, harmony and togetherness.

The festivities were organised over two days in the adjacent MCD Park, where a suitable arrangement was made for devotees to offer their prayers to the Sun God.



On 15th November 2026, devotees gathered in the evening to offer Sandhya Arghya (prayers to the setting Sun). The surroundings resonated with traditional Chhath songs, devotional chants and the spirit of this auspicious festival. Devotees offered Arghya with traditional offerings, seeking blessings for the well-being, prosperity and happiness of their families.


The celebrations continued on 16th November 2026, when devotees assembled early in the morning to offer Usha Arghya to the rising Sun. The beautiful sight of the morning prayers reflected the deep faith, dedication and cultural significance associated with Chhath Puja.




Following the morning prayers, Prasad was distributed among residents, with everyone participating wholeheartedly in the celebrations.

What made this occasion particularly special was the enthusiastic participation of residents from different backgrounds. The festival not only provided an opportunity to observe our rich cultural traditions but also strengthened the bonds of friendship, unity and mutual respect among members of the society.

The successful celebration of Chhath Puja within our residential premises reflects the spirit of community participation, cultural diversity and collective harmony that makes Royal Green Apartments a wonderful place to live.


Heartfelt thanks to all the devotees, volunteers, contributors and residents whose cooperation and support made this celebration memorable.

May Chhathi Maiya and Surya Dev bless everyone with good health, happiness, prosperity and peace.

With regards,

Chhath puja organising committee,
Royal Green Apartments RWA

Monday, November 2, 2026

DEACTIVATION OF PACK FLOW CONTRO VALVE

Pack Flow control Valve 23HB

DEACTIVATION:-

Open the Air conditioning panel of Pack1/Pack1

(1)Remove and discard the LOCK WIRE from the Pressure seal cap (Brass colour in pic) 

(2)Remove the Pr seal cap from the Pack flow control unit

(3)Make sure that the Forked valve position indicator is in the CLOSED position.refer in the picture.

(4)Install the Pr.Cap seal between the forks of the forked-Valve position lever and threaded boss

(5) Safety the pr seal cap with lock wire.

As soon as this cap is opened,air moves out and FCV butterfly goes to Close position.

Check that Fork is now at a close position.

Follow step 4 and 5 as above.

For more details refer relevant AMM.

Thursday, October 29, 2026

WINDSHIELD REMOVAL INSTALLATION

LH WINDSHIELD REMOVAL/INSTALLATION 

Wind Shield FIN -3DG1/3DG2

Wind shield P/N-STA320-1-7-1 OR NPS165311-7

O-Ring for Spray Nozzle-

NSA8207-2 &NSA8207-3

Torque reqd for Bolts-144 TO 170 LBFT-INCH

Sealant -06AEB2,06LCG9,13GAB8

Non Aqueous cleaner-08BAA9

Aluminium Foil-05RAB9

Curing time-

Clearances reqd-Refer AMM pic below.

C/Bs reqd to be opened are -

49VU-H04

121VU-K13

122VU-W14,W13,X14,X13,

123VU-AF10,AF03

AMM REF:-5611-11-000/400-001-A


NOTE WHILE REMOVING THE WINDSHIELD,MAKE A TEMPLATE AND ENSURE INSTALLING ALL THE BOLTS,ICING TUBE ETC exactly at same locations so that while installing,you must install exactly at same locations so that this will minimise any error in installation.

(1)Once the window is placed and held in position either manually or by the help of a special tool,engage the bolts and give the Torque between 144 to 170 lbft-inch.

Follow the TQ sequence for Upper, Bottom and Mid frame as under:-


(2)Upper & Bottom plates are installed.

(3)Be cautious while installing the bolts,extra care to be given for each bolts position and follow the Torque sequence.

(4)Clearances to be measured as under at following locations:-



Ice Tube is installed from top to 6th position in place of bolt and nut is tightened from inside.

Eye balls are installed on the center arm from inside.Its plate is attached at 2nd bolt,leaving the top bolt.

Eyeballs will be attached in such a way that RED one will be at top.

Sealant will be applied at each intersection of upper,lower and center plates alongwith all the 33 bolt’s head.

Install the interior center and side fairing and wait until sealant get cured.

Sealant curing time is generally mentioned on its package as it depends sealant composition that varies with manufacturer.Usually it takes 8 to 10 hrs 

If Aircraft is routed for flight before curing,we followed the process of applying HST on each interfacing where sealants have been applied and at bolt heads.

Mention this in Techlog for GVI of Aluminium foil until curing time gets over but ensure that flying time is excluded is added in actual curing time 


Wednesday, October 21, 2026

Navratri Pooja at Royal Green Apartments

🌺 Navratri Pooja at Royal Green Apartments 🌺

The auspicious occasion of Navratri was celebrated with immense joy, devotion and happiness at Royal Green Apartments.

An idol of Maa Durga was beautifully placed adjacent to Shivalaya, where daily pooja was performed, worshipping the different divine forms of Maa Durga throughout the nine sacred days. The celebrations were accompanied by Sandhya Aarti every evening, filling the atmosphere with devotion, peace and spiritual energy.

💃 Dandiya Night added colour and excitement to the festivities, as residents participated enthusiastically and enjoyed the occasion to the fullest, making it a memorable celebration for everyone.

https://drive.google.com/file/d/1L7yIg0edfaTfmLqCwX4QRZV_pDsRnSOU/view?usp=drivesdk


🙏 Today, we bid farewell to Maa Durga with heavy hearts and tears in our eyes. The ten days of devotion, togetherness and celebration have come to an end, leaving behind cherished memories and a renewed sense of faith and unity among our residents.

May Maa Durga continue to shower her blessings upon all residents and their families, bringing happiness, prosperity, good health and peace to every home.

Jai Mata Di! 🙏🌺

With warm regards,
Pramod Kumar


Sunday, October 18, 2026

Replacement of AILERON SERVO ACTUATOR 

FIN  No-

33CE1/33CE2/33CE3/33CE4

WEIGHT OF SERVO is 7.4 kg Hence be careful while removing.

Trestles of 13 feet (4M),

Following jobs are to be done:-

(1)PTU isolation coupling is to be disconnected AMM REF 29-23-00-860-001

(2)Both the G and B Hydraulic system to be depressurised IAW AMM 29-10-00-864-003/-001

and following CBs are to be Open and safetied.

(3)Open the Panel at bottom and Top

(4)Aileron Collar PN-98D27104005000

is required to be installed on Servo which is not being worked upon.

(5)Remove following CBs and safetied:-

49VU-B11

121 VU-R20

105 VU-A01,A02

(6)TQ required11 to 12 lbft-ft

(7)Remove the Electrical connector and cap it prevents Hyd contamination of its contact.


Packings P/N -NAS 1611-112 & NAS1611-010 are of Hyd Pr & Return line.

Practically,it isn't required as it is the part of Aileron Servo.

Servo Actuator P/N-31073-110


AILERON SERVO ACTUATOR 


There are Two lock plate,one is at the Rear Jack of servo locking & another at Fwd jack of Servo.

The lock plate is to be placed over the head of the PIN and is to be locked.

To get access to the FWD lock Plate,open the Aileron top panel and for which one needs a long arm rachet.



After removing the rear jack PIN,remove both the Pressure & Return line,this will give slightly more access to the FWD jack.

After accomplishment of the job,noemalise the Aircraft.

Follow applicable AMM,this is just a guide lines 


Sunday, October 11, 2026

Manual deployment & Stowing of Blocker Door of CFM 56 Engine

Manual deployment/stowing of T/R Blocker door on CFM 56 Engine

Refer AMM 

  1. T/R Manual deactivation:-

78-30-00-481-041-B

  1. Manual deployment of Blocker door:-

78-32-41-860-001-A

  1. Manual stow of Blocker door:-

78-32-41-860-002-A

  1. Operational test of TR through CFDS:-

78-31-00-710-042-A


Deactivate T/R for maintenance by pulling HCU lever away from the flight position.

Remove the Stow pin from its Stow position and put this pin in while the lever is away from the flight position.


HCU lever is located at 1 O’ Clock  aft looking fwd.


Manual unlock Shaft:-

Manual UNLOCK SHAFT as shown in picture is accessed and unlocked by the use of a 5/16 inch wrench.


Blocker door is unlocked by getting lock released from hook and one can see the gap of about 1 inch of Blocker door from its initial Locked position.Once it is done you move to the next step to unlock manual unlock Square.

This is done only after removing the Thermal Blanket which is wire locked in 3 parts over the UNLOCK SHAFT.

There are 4 unlock Shafts and 4 Manual unlock Squares.

The process is repeated on each shaft and square to Deploy or Stow all the 4 Blocker doors in each engine.

Manual unlock Square:-



This Square is to be placed by the wrench to the UNLOCK position and at the same time BLOCKER DOOR TO BE PULLED OUT by hand and to deploy.

The blocker door gets deployed.

NOTE:- FOR STOWING THE BLOCKER DOOR MANUALLY,EACH DOOR IS PUSHED IN WHERE AS IT IS PULLED OUT WHILE MANUAL SQUARE IS PLACED IN UNLOCK POSITION.

 while it is stowed,it may not get fully flushed with a surface which gets properly seated when T/R test is conducted through MCDU.

For conducting Test follow MCDU procedure by pressurizing Electric Pump and putting the relevant engine FADEC ON.

Once the test is done T/R moves physically to Deploy and Stow position and Blocker Door seated properly.You will get Test OK or Failure msg.

This is a simple guidance to do the job,refer to the applicable manual.