(1) Check the pressure of the N2 Bottle.It must be more than 2000 psi for both ie Door Damper and Power Accumulators and at least 1500 to 1600 psi for Brake Accumulator.
(2)Attach LP or HP Gauge with the N2 Bottle placed on N2 trolley (based upon your requirements)
(3)Attach the supply hose with LP/HP Gauge placed on the trolley then the another free end of the hose is to be attached with the Accumulator Relief valve b:y remaving the dust cap(hexagonal shape cap) at the end Brass fitting.
(4) Brass fitting is to be attached behind the charging Nut of Accumulator
(5)Now open the N2 trolley cylinder and the pr will be available to its gauge.
(6) Now open the regulator slowly and maintain slightly higher pr than the remaining accumulator pr to prevent reverse flow.
(7)Now check nut is to be opened by spanner 3/4 in the OPEN direction slowly until you fill tightness whilebopening check nut.
(8)Move the checknut in CLOSED direction and you will find that fillingof nitozen starts.As soon as you find accumulator is charged as per AMM limit;stop and close the bottle pr at trolley.
(9)Remove the brass fitting at Accumulator
(10)Install the dust cap.
No comments:
Post a Comment