Friday, November 20, 2026

Chhath puja 2026


         CHHATH PUJA 2026

Chhath Puja was celebrated with immense devotion, enthusiasm and traditional fervour within the premises of Royal Green Apartments, Sector 11, Dwarka. The celebration brought residents together, creating an atmosphere of spirituality, harmony and togetherness.

The festivities were organised over two days in the adjacent MCD Park, where a suitable arrangement was made for devotees to offer their prayers to the Sun God.



On 15th November 2026, devotees gathered in the evening to offer Sandhya Arghya (prayers to the setting Sun). The surroundings resonated with traditional Chhath songs, devotional chants and the spirit of this auspicious festival. Devotees offered Arghya with traditional offerings, seeking blessings for the well-being, prosperity and happiness of their families.


The celebrations continued on 16th November 2026, when devotees assembled early in the morning to offer Usha Arghya to the rising Sun. The beautiful sight of the morning prayers reflected the deep faith, dedication and cultural significance associated with Chhath Puja.




Following the morning prayers, Prasad was distributed among residents, with everyone participating wholeheartedly in the celebrations.

What made this occasion particularly special was the enthusiastic participation of residents from different backgrounds. The festival not only provided an opportunity to observe our rich cultural traditions but also strengthened the bonds of friendship, unity and mutual respect among members of the society.

The successful celebration of Chhath Puja within our residential premises reflects the spirit of community participation, cultural diversity and collective harmony that makes Royal Green Apartments a wonderful place to live.


Heartfelt thanks to all the devotees, volunteers, contributors and residents whose cooperation and support made this celebration memorable.

May Chhathi Maiya and Surya Dev bless everyone with good health, happiness, prosperity and peace.

With regards,

Chhath puja organising committee,
Royal Green Apartments RWA

Thursday, November 19, 2026

N2 CHARGING PROCEDURE

Whenever Nitrogen is being either charged to Brake Accumulator,Door Damper and or Hydraulic Power Accumulators(G, Y or B),you need a Nitrogen trolley with HP Gauge,Hose and required spanner with Adaptors(Brass adapters straight or Right angled Elbow ).
(1) Check the pressure of the N2 Bottle.It must be more than 2000 psi for both ie Door Damper and Power Accumulators and at least 1500 to 1600 psi for Brake Accumulator.
(2)Attach LP or HP Gauge with the N2 Bottle placed on N2 trolley (based upon your requirements)
(3)Attach the supply hose with LP/HP Gauge placed on the trolley then the another free end of the hose is to be attached with the Accumulator Relief valve b:y remaving the dust cap(hexagonal shape cap) at the end Brass fitting.

(4) Brass fitting is to be attached behind the charging Nut of Accumulator
(5)Now open the N2 trolley cylinder and the pr  will be available to its gauge.
(6) Now open the regulator slowly and maintain slightly higher pr than the remaining accumulator pr to prevent reverse flow.
(7)Now check nut is to be opened by spanner 3/4 in the OPEN direction slowly until you fill tightness whilebopening check nut.
(8)Move the checknut in CLOSED direction and you will find that fillingof nitozen starts.As soon as you find accumulator is charged as per AMM limit;stop and close the bottle pr at trolley.
(9)Remove the brass fitting at Accumulator 
(10)Install the dust cap.



DEACTIVATE HOT AIR PR REGULATING VALVE

DEACTIVATION of the Hot Air Pr Regulating Valve (14HK)

AMM 21-63-00-040-002-A

P/N-70853A010001

Make sure that 

APU BLEED PB SW IS RELEASED,

PACK 1 & PACK 2 OFF

Open the Fwd Cargo compartment door 825 amm task 52-30-00-860-002/-003

Remove the access panel Fr34

Open the Following CBs

49VU-D08

122VU-W21,W22,X21,X22,Y21,Y20 AND Y18

Turn the manual override (3) to CLOSED POSITION. 

Disconnect the electrical connector and Blank it

Temporarily attach disconnected connector to the aircraft structure,

On the ECAM COND HOT AIR FAULT msg comes into view,ignore it

On the SD page,if indications other than the Green valve closed indications come into view ,ignore them.


Monday, November 2, 2026

DEACTIVATION OF PACK FLOW CONTRO VALVE

Pack Flow control Valve 23HB

DEACTIVATION:-

Open the Air conditioning panel of Pack1/Pack2

(1)Remove and discard the LOCK WIRE from the Pressure seal cap (Brass colour in pic) 

(2)Remove the Pr seal cap from the Pack flow control unit

(3)Make sure that the Forked valve position indicator is in the CLOSED position.refer in the picture.

(4)Install the Pr.Cap seal between the forks of the forked-Valve position lever and threaded boss

(5) Safety the pr seal cap with lock wire.

As soon as this cap is opened,air moves out and FCV butterfly goes to Close position.

Check that Fork is now at a close position.

Follow step 4 and 5 as above.

For more details refer relevant AMM.