Removal of Fan Blade
Job set up-
PULLER,VYNYLE TAPE,ANTI SEIZE COMPOUND,AEROKROIL and Vaseline.
AMM 73-21-20-960-801-A
AMM72-21-20-000/400-801-A
To start the job, one has to identify the N1 blade and then mark the number of each blade ccw Fwd looking Aft.
The Blade which is to be removed to be kept at 6 O’clock position.
You can refer this example below:-
Observed some X-mm cracks on Engine 1 Blade No xx,
Blade No xx and opposite blade #YY removed as per AMM
For removal
Step 1:-Spinner is removed by the use of bit No 27 TQ 67 to 74l f-in
AMM 72-21-40-100/400-801-A
Step2:-Remove the platform front shroud by the use of 5/16 bit
AMM 72-21-60-000/400-801-A
TQ 109 to 120 lbf.in(18bolts)
Step3:-Both side FAN BLADE PLATFORM are pushed downward by placing the Blade at 6 O Clock psn.
AMM:72-21-42-000/400-801-A
Step 4:-remove the spacer by pulling it in fwd direction
Step 5:- Remove the lock plate
Step 6:- Remove the Blade
For installation of the Fan Blade refer the applicable AMM as mentioned above.
Infact the reverse process,
Install the Fan Blade followed by spacer and Lock plate.Further to front lock platform and spinner.
No comments:
Post a Comment