Cockpit LH Fixed Window
FIN 7DG1/7DG2
LH Fixed Window P/N-NH25216-349
Screw-ASNA2001V5-15
Sealant-PR1828-B1-2
CLOTH-14SBA1
Anti corrosion compound -CA1000
Following CBs are to be safetied open:-
122VU /X13,X14,
123VU /AF10
TQ required to be given to screws between 11.8 to 13.2lbft
PN-TO BE CHECKED WHICH MAY BE OF GKN OR SGS supplier
Select AMM relevant TASK as per its manufacturer/supplier.
AMM TASK 56-11-12-000/400-002-A
Step 1 Remove inner liner
Step 2 Remove window connector
Step 3- There are 45 screws of same P/N that are to be removed by the use of Bit size of Quarter alpha.
Follow the TQ sequence while installation as detailed in picture below:-
Out of flush dimensions and peripheral clearance must not be out of tolerance.
After installation, normalised the Aircraft and put the CBs in.
Apply sealant and wait for its curing time.
There are different curing processes,refer AMM for this.
This is just a simple guide to work however you must follow the applicable AMM.
No comments:
Post a Comment